banner small

New Earth to build its first AD plant

Organics recycling specialist New Earth Solutions has been granted planning permission for its first anaerobic digestion (AD) facility in the UK.

Bristol city council last week approved plans for the AD facility to be developed at the companys site at Willow Farm, Avonmouth. The plant is expected to be commissioned by autumn 2013.

The proposed site of the Avonmouth AD facility, just up the road from New Earth Solution's MBT plant
The proposed site of the Avonmouth AD facility, just up the road from New Earth Solution’s MBT plant

New Earth Solutions had originally planned to build an in-vessel composting (IVC) facility at the site to treat green and food waste. However, the company changed its plans as more councils began to collect food separately.

Once complete, the anaerobic digestion facility will have the capacity to process up to 50,000 tonnes of food waste every year from households and businesses. It will also produce up to three megawatts of electricity, enough to power up to 5,000 homes in the area.

Feedstock for the plant will come from New Earth Solutions existing food waste treatment contracts with a number of councils, including: Bristol city, Bath, North East Somerset, Cardiff and Newport.

Facility

Commenting on the facility, Robert Asquith, planning director at New Earth, said: The Willow AD plant responds to the increasing interest in separate collections of food waste throughout the West of England and in neighbouring regions including South Wales. AD is a highly appropriate technique to recycle this bio-waste back to the soil and offers the added benefit of producing renewable heat and power.

Alongside our existing IVC and MBT, and the pyrolysis and gasification plant we are currently building at Avonmouth, Willow AD will enable us to offer the widest possible range of waste management options to local authorities and other waste producers near the M4 and M5 corridors.

Region

Related Links

New Earth Solutions

New Earth Solutions said the AD plant would complement its existing facilities in the region, which include a mechanical biological treatment (MBT) plant, based just down the road from the Willow Farm site. The MBT plant was opened in September 2011 by Olympian Sir Steve Redgrave (see letsrecycle.com story) and New Earth is currently building a gasification and pyrolysis plant next to it.

In total, New Earth currently operates two IVC facilities and three MBT plants in the UK.

Register for free to comment

Subscribe to receive our newsletters and to leave comments.

The Blog Box

Back to top

Subscribe to our newsletter

Get the latest waste and recycling news straight to your inbox.

Subscribe
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.